Location

The land plot of 50 ha is provided on the terms of long time lease with the right of redemption by the Nizhny Novgorod region Ministry of government property and land resources for engineering, construction and operation of a logistic centre.
The land plot is located in Doskino of Avtozavodskoy district of Nizhny Novgorod, close to the railway and highway connecting Nizhny Novgorod and Moscow. It also neighbors the territory of the city airport and railway depot Doskino and has a railway connection. The railway is fully equipped to receive fresh and deep frozen goods at the warehouse.
The key parameters of Logistic centre LITIER Oka on the first phase:
- The total warehouse area is 83 ths. sq.m, including the FMCG area of 50.5 ths. sq.m, cross-docking terminal of 5 ths. sq.m, 14 ths. sq.m of fresh zone and 13.5 ths. sq.m of deep frozen zone. There is a possibility to extend warehouse area up to 200 ths. sq.m in the future.
- Clear height of the warehouse – 12.5 m
- Pallet-places – 99 ths.
- Gates – 176
- Offices and social area – 12.5 ths. sq.m

At the logistic centre territory we plan an intermodal container terminal for processing of 20’ and 40’ containers coming by railway and road. There are special areas projected for containers (incl. refrigerated) storage.
The warehouse complex will be both distribution centre and transshipment terminal, will process container flows and provide additional warehouse services.
It’s necessary to note that besides FMCG warehouse there will be different temperature zones (fresh and deep frozen warehouses). This is very important for companies dealing with different kinds of food products.
Cargo mezzanines and special blocks for loading/unloading and additional cargo handling are planned within each temperature zone. Wide-aisle racking has been taken as the basis for operational cargo handling and picking; besides the universal column step allows to change the racking configuration according to the requirements of the certain client and to add other kinds of racking. In the deep frozen warehouse there has been planned a separate zone for picking. We plan quarantine zone for the spoilt goods according to sanitary norms. Each warehouse temperature zone is additionally divided by compartments to keep the sanitary conditions of goods storage.
Construction terms.jpg)
The warehouse construction starts in 2011.
The 1-st construction phase will start operations in 2013. The 1-st construction phase will include:
- The necessary for the 1-st construction phase operations access roads (automobile and railway) and networks
- Half of the container terminal
- Half of the FMCG warehouse
- Deep frozen warehouse
The 2-nd construction phase will start operations in 2013. The 2-nd construction phase will include:
- The remaining access roads (automobile and railway) and networks
- The remaining part of the container terminal
- The remaining part of the FMCG warehouse
- Fresh warehouse
- Cross-docking
Financial and operational highlights
- The total investment makes about $ 179 mln.
- The internal rate of return (IRR) totals 17.4%
- The payback period at discount value of 11.75% will make 10.9 years
|